| Exhibit No. | Description |
|---|---|
| WNST-01 | Wa Ni Ska Tan Intervener Application - February 24, 2026 |
| WNST-02 | WNST-MH Round I Information Requests 1-25 (Responses received April 15, 2026) - March 19, 2026 |
| WNST-03 | WNST-EM Round I Information Request 1 (Response received April 15, 2026) - March 19, 2026 |
| WNST-04 | WNST Letter to PUB re Motion to Compel Responses to Round I Information Requests - April 20, 2026 |
| WNST-05 | WNST Letter to PUB re Motion Concerning Round I Information Requests - April 23, 2026 |
| WNST 06 | WNST-MH Round II Information Requests 1-6 (Responses received May 22, 2026) - April 30, 2026 |
| WNST-07 | WNST-EM Round II Information Requests 1-3 (Responses received May 22, 2026) - April 30, 2026 - Revised |
| WNST-08 | WNST-DEA Information Requests 1-2 (Responses received May 26, 2026) - May 8, 2026 |
| WNST-09 | WNST Letter to PUB re Motion to Amend Intervener Application - May 12, 2026 |
| WNST-10 | WNST Letter to PUB Reply to Manitoba Hydro's response to Motion for Amended Scope - May 20, 2026 |
| WNST-11 | WNST Letter to PUB re Motion to Compel Answer from Manitoba Hydro Regarding Round II IR WNST-MH-II-13a-d – May 27, 2026 |
| WNST-12 | WNST Letter to PUB re Budget Estimate Amendmenr, Request for Extension of Time and Motion to Vary Order 39/26 - June 2, 2026 |
| WNST-13 | WNST Letter to PUB re Filing of Intervener Evidence - June 12, 2026 |
| WNST-14 | Daniel Kadu Written Evidence - June 12, 2026 |
| WNST-15 | Leslie Dysart Verbal Evidence - June 12, 2026 |
| WNST-16 | Letter to PUB re Scope of Oral Evidence - June 19, 2026 |
| WNST-17 | Dr. Stephane McLachlan Report - June 22, 2026 |
| WNST-18 | WNST-CC Information Requests 1-4 - June 29, 2026 |
| WNST-19 | WNST-MKO Information Requests 1-3 - June 29, 2026 |
| WNST-20 | Opening Statement - July 27, 2026 |
| WNST-21 | Book of Documents - Cross Examination of Efficiency Manitoba - August 10, 2026 |
| WNST-22 | Community Witness Panel Biographies - August 20, 2026 |
| WNST-23 | Book of Documents - Manitoba Hydro - August 20, 2026 |
| WNST-24 | Presentation of Daniel Gladu Kanu - August 20, 2026 |
| WNST-25 | Presentation of Stephane McLachlan - August 20, 2026 |
| WNST-26 | Closing Submissions and Presentation - September 4, 2026 |
| Exhibit No. | Description |
|---|---|
| CC-01 | Letter from Consumers' Coalition to Public Utilities Board regarding Draft Schedule and Process - February 6, 2026 |
| CC-02 | Intervener Application - February 24, 2026 |
| CC-03 | Pre-Hearing Conference Presentation - March 2, 2026 |
| CC-04 | CC-MH Round I Information Requests 1-65 (Responses received April 15, 2026) - March 19, 2026 |
| CC-05 | CC Motion to Compel Responses to Round I Information Requests - March 27, 2026 |
| CC-06 | CC Reply to PUB re Anticipatory Motion to Compel Responses to Round I Information Requests - April 7, 2026 |
| CC-07 | CC Reply re Information Requests Identified in PUB Order 55/26 - April 17, 2026 |
| CC-08 | CC letter to PUB re Round I Information Requests Responses – April 20, 2026 |
| CC-09 | CC letter to PUB re Round I Information Requests - Incomplete and Confidential Responses - April 23, 2026 |
| CC-10 | CC-MH Round II Information Requests 1-45 (Responses received May 22, 2026) - April 30, 2026 |
| CC-11 | CC Letter to PUB re Major New Facilities Amendment to Scope of Intervention - May 5, 2026 |
| CC-12 | CC Letter to PUB re MIPUG Motion re Access to Unredacted Daymark Report - May 7, 2026 |
| CC-13 | CC Letter to PUB re Major New Facilities Review - Reply re Request for Amendment to Scope of Intervention - May 8, 2026 |
| CC-14 | CC-DEA Information Requests 1-18 (Responses due May 26, 2026) - May 8, 2026 |
| CC-15 | CC-MH Round III Information Requests 1-39 (Responses received June 12, 2026) - May 19, 2026 |
| CC-16 | CC Letter to PUB re Motion re Round II IRs Motion, Delays on Independent Expert Evidence, Request for Extension of Time on Intervener Evidence and Availability of Expert Witnesses - May 27, 2026 |
| CC-17 | CC Letter to PUB re Reply to Round II IR Motion - June 1, 2026 |
| CC-18 | CC Letter to PUB re Response to Applicaton to Review and Vary Order 63/26 re Motion to Access Unredacted Daymark Report - June 5, 2026 |
| CC-19 | CC Letter to PUB re Extension of Time, Guidance and Concerns Regarding Public Hearing Dates - June 9, 2026 |
| CC-20 | Evolved Energy Report - June 16, 2026 |
| CC-21 | Evidence of Dr. Patricia Fitzpatrick - June 19, 2026 |
| CC-22 | Appendix 3 of Evidence of Dr. Patricia Fitzpatrick - June 19, 2026 |
| CC-23 | Letter to PUB re Submission on Scope of Oral Evidence - June 19, 2026 |
| CC-24 | CC-PTC Information Requests 1-17 - June 24, 2026 |
| CC-25 | Evidence of Darren Rainkie - June 25, 2026 |
| CC-26 | CV of Darren Rainkie - June 26, 2026 |
| CC-27 | CC-GSS-GSM Information Requests 1-4 - June 29, 2026 |
| CC-28 | CC-MIPUG Information Requests 1-4 - June 29, 2026 |
| CC-29 | CC-MKO Information Requests 1-2 - June 29, 2026 |
| CC-30 | CC-WNST Information Request - June 29, 2026 |
| CC-31 | Letter to PUB re Updated Evolved Energy Report - July 14, 2026 CC-20-1 and CC-20-2 |
| CC-32 | CC-MH Pre-Ask 1 |
| CC-33 | Volume II Evolved Energy Research Evidence, Redacted - July 22, 2026 |
| CC-34 | MPA Morrison Park Advisors Inc. Report, Redacted - July 22, 2026 |
| CC-35 | Opening Statement - July 27, 2026 |
| CC-36 | 2025 LTRA Sensitivity Case - Addition of ERAS Resources in the MISO Assessment Area - July 28, 2026 |
| CC-37 | Illustrative Month - August 5, 2026 |
| CC-38 | NFAT Reliability Evaluation - August 5, 2026 |
| CC-39 | Morrison Park Advisors Presentation - August 12, 2026 |
| CC-40 | Improving Grid Reliability - August 14, 2026 |
| CC-41 | The Electricity Journal No. 35 - Augst 14, 2026 |
| CC-42 | NWT PUB Decision 14-2004 - August 14, 2026 |
| CC-43 | Evolved Energy Research Direct Presentation - August 17, 2026 |
| CC-44 | Exhibit M-12 Dispatchable Generation Application Supplemental Filing August 14, 2025 - August 19, 2026 |
| CC-45 | Dr. Patricia Fitzpatrick Presentation - August 19, 2026 |
| CC-46 | BC Utilities Comission 2015 CPCN Application Guidelines - August 26, 2026 |
| CC-47 | BC Hydro and Power Authority Decision and Order C-6-22 - August 26, 2026 |
| CC-48 | Presentation of Darren Rainkie - August 27, 2026 |
| CC-49 | FERC Order No. 804 dated February 19, 2015 - August 28, 2026 |
| CC-50 | IESO Methodology to Perform the Reliability Outlook Document - August 28, 2026 |
| CC-51 | Response to Undertaking 41 - August 29, 2026 |
| CC-52 | Closing Submissions of Consumers Coalition - September 3, 2026 |
| Exhibit No. | Description |
|---|---|
| GSS-GSM-01 | GSS-GSM Intervener Application - February 24, 2026 |
| GSS-GSM-02 | GSS-GSM-MH Round I Information Requests 1-17 (Responses received April 15, 2026) - March 19, 2026 |
| GSS-GSM-03 | Letter to PUB re Consumer Coalition Motion - March 30, 2026 |
| GSS-GSM-04 | GSS-GSM Letter to PUB re Round I Information Request Motion - April 17, 2026 |
| GSS-GSM-05 | GSS-GSM-MH Round II Information Requests 1-25 (Responses received May 22, 2026) - May 4, 2026 |
| GSS-GSM-06 | GSS-GSM-EM Round II 1-2 (Responses received May 22, 2026) - May 4, 2026 |
| GSS-GSM-07 | GSS-GSM-DEA Information Requests 1-5 (Responses due May 26, 2026) - May 8, 2026 |
| GSS-GSM-08 | GSS-GSM-MH Round III Information Requests 1-9 (Responses received June 12, 2026) - May 19, 2026 |
| GSS-GSM-09 | Letter to PUB re Leave to file Evidence - June 4, 2026 |
| GSS-GSM-10 | Evidence of M. Davies - June 16, 2026 |
| GSS-GSM-11 | Letter to PUB re Scope of Oral Evidence - June 19, 2026 |
| GSS-GSM-12 | GSS-GSM-PTC Information Request - June 24, 2026 |
| GSS-GSM-13 | GSS-GSM-CC Information Requests 1-7 - June 29, 2026 |
| GSS-GSM-14 | GSS-GSM-MEED Information Request - June 29, 2026 |
| GSS-GSM-15 | GSS-GSM-MIPUG Information Requests - June 29, 2026 |
| GSS-GSM-16 | Presentation of CME - August 12, 2026 |
| GSS-GSM-17 | Presentation of Melissa Davies - August 12, 2026 |
| GSS-GSM-18 | Undertaking Response 20 - Canadian Manufacturers and Exports - August 24, 2026 |
| GSS-GSM-19 | Undertaking Response 21 - August 26, 2026 |
| GSS-GSM-20 | Written Final Argument - September 4, 2026 |
| GSS-GSM-21 | Closing Submission Presentation - September 4, 2026 |
| Exhibit No. | Description |
|---|---|
| MEED-01 | MEED Intervener Application - February 24, 2026 |
| MEED-02 | MEED Pre-Hearing Presentation - March 2, 2026 |
| MEED-03 | MEED Letter to PUB re Early Document Sharing - March 16, 2026 |
| MEED-04 | MEED-MH Round I Information Requests 1-34 (Responses received April 15, 2026) - March 19, 2026 |
| MEED-05 | MEED-EM Round I Information Requests 1-6 (Responses due April 15, 2026) - March 19, 2026 |
| MEED-06 | Letter to PUB re Consumer Coalition Motion - March 31, 2026 |
| MEED-07 | Letter to PUB re PUB's March 31, 2026 Direction to MH's April 6, 2026 Reply - April 7, 2026 |
| MEED-08 | Letter to PUB re Motion and Access to Confidential
Information – April 17, 2026 |
| MEED-09 | Letter to PUB re Motion Round I IR Responses from Manitoba Hydro – April 20, 2026 |
| MEED-10 | Letter to PUB re Additional Motion Request - April 21, 2026 |
| MEED-11 | Letter to PUB re Motions Round I Information Request Responses - April 23, 2026 |
| MEED-12 | MEED-MH Round II Information Requests 1-7 (Responses received May 22, 2026) - April 30, 2026 |
| MEED-13 | Letter to PUB re Manitoba Hydro's Request to Review and Vary Board Order 59-26 - May 4, 20206 |
| MEED-14 | MEED-DEA Information Requests 1-8 (Responses received May 26, 2026) - May 11, 2026 |
| MEED-15 | MEED-MH Round III Information Requests 1-7 (Responses received June 12, 2026) - May 19, 2026 |
| MEED-16 | Letter to PUB re Response to Sustainable Brandon Intervention Application - May 26, 2026 |
| MEED-17 | Letter to PUB re Motions Under Rules 8 and 35 - May 27, 2026 |
| MEED-18 | Letter to PUB re Response to Manitoba Hydro re Motions - June 1, 2026 |
| MEED-19 | Letter to PUB re Manitoba Hydro's Motion to Review and Vary Board Order No. 63/26 - June 5, 2026 |
| MEED-20 | Letter to PUB re Affidavit of Jason Rioux - June 12, 2026 |
| MEED-21 | Letter to PUB re Reply to Manitoba Hydro Evidence Objections - June 18, 2026 |
| MEED-22 | Letter to PUB re Submissions on Oral Hearing Scope - June 19, 2026 |
| MEED-23 | MEED-MIPUG Information Requests 1-3 - June 29, 2026 |
| MEED-24 | Letter to PUB re Review and Vary Board Order 100/26 Motion - July 13, 2026 |
| MEED-25 | Letter to PUB re Reply Regarding Review and Vary Motion - July 24, 2026 |
| MEED-26 | Opening Statement - July 27, 2026 |
| MEED-27 | Document Book for Manitoba Hydro Panel 1 - July 29, 2026 |
| MEED-28 | MEED-MH Pre-Ask Panel 2 |
| MEED-29 | Document Book for Manitoba Hydro Panel 2 - August 5, 2026 |
| MEED-30 | Document Book for MPA - August 13, 2026 |
| MEED-31 | Document Book for Patrick Bowman - August 19, 2026 |
| MEED-32 | Document Book for Dr. Fitzpatrick - August 20, 2026 |
| MEED-33 | MEED Pre-Ask Manitoba Hydro Panel 3 - August 21, 2026 |
| MEED-34 | Closing Presentation of MEED - September 3, 2026 |
| Exhibit No. | Description |
|---|---|
| MIPUG-01 | MIPUG Intervener Application - February 24, 2026 |
| MIPUG-02 | MIPUG Letter to Public Utilities Board re Efficiency Manitoba Participation - February 20, 2026 |
| MIPUG-03 | Pre-Hearing Conference Notes - March 2, 2026 |
| MIPUG-04 | MIPUG-MH Round I Information Requests 1-29 (Responses received April 15, 2026) - March 19, 2026 |
| MIPUG-05 | MIPUG-EM Round I Information Requests 1-7 (Responses due April 15, 2026) - March 19, 2026 |
| MIPUG-06 | MIPUG Letter to PUB Reply re Commercially Sensitive Information - April 17, 2026 |
| MIPUG-07 | MIPUG-MH Round II Information Requests 1-13 (Responses received May 22, 2026) - April 30, 2026 |
| MIPUG-08 | MIPUG-EM Round II Information Request (Response received May 22, 2026) - April 30, 2026 |
| MIPUG-09 | MIPUG Letter to PUB re Motion CSI Information in Daymark Report/Access to Unredacted Daymark Report – May 5, 2026 |
| MIPUG-10 | MIPUG-DEA Information Requests 1-15 (Responses received May 26, 2026) - May 8, 2026 |
| MIPUG-11 | MIPUG-MH Round III Information Requests 1-6 (Responses received June 12, 2026) - May 19, 2026 |
| MIPUG-12 | MIPUG Written Submission re Review and Vary Application of Manitoba Hydro Regarding Board Order No. 63/26 - June 5, 2026 |
| MIPUG-13 | MIPUG Letter to PUB re extension request of expert evidence - June 10, 2026 |
| MIPUG-14 | Evidence of P. Bowman - June 16, 2026 |
| MIPUG-15 | Evidence of D. Friesen - June 16, 2026 |
| MIPUG-16 | Letter to PUB re Scope of Oral Evidence - June 19, 2026 |
| MIPUG-17 | MIPUG-PTC Information Requests 1-3 - June 24, 2026 |
| MIPUG-18 | MIPUG-CC Information Requests 1-10 - June 29, 2026 |
| MIPUG-19 | MIPUG-GSS-GSM Information Requests 1-13 - June 29, 2026 |
| MIPUG-20 | Cross Document - Pages 49 to 56 - July 29, 2026 |
| MIPUG-21 | Lacapra Evidence Supplemental - July 31, 2026 |
| MIPUG-22 | Load Projections - August 5, 2026 |
| MIPUG-23 | Navius Research Report - Role of Thermal Energy Storage in Reducing Peak Load from Building Electrification - August 11, 2026 |
| MIPUG-24 | Navius Research Report - Impact of Charging Integrated Phase Change Thermal Energy Storage Heat Pump Systems on Provincial Power Grids - August 11, 2026 |
| MIPUG-25 | Patrick Bowman Presentation - August 18, 2026 |
| MIPUG-26 | Dale Friesen Presentation - August 19, 2026 |
| MIPUG-27 | Response to Undertaking 23 - August 21, 2026 |
| MIPUG-28 | Enbridge Customer Presentation - August 26, 2026 |
| MIPUG-29 | Undertaking 26 Updated Slide 22 - August 26, 2026 |
| MIPUG-30 | GE Verona Plans New 41 Million 50 Job Investment - August 27, 2026 |
| MIPUG-31 | GE Verona Accounment Investment in Greenville Facility - August 27, 2026 |
| MIPUG-32 | Upstate Business Journal News Release - August 27, 2026 |
| MIPUG-33 | Response to Undertaking 25 - August 31, 2026 |
| MIPUG-34 | Response to Undertaking 24 - August 31, 2026 |
| MIPUG-35 | Final Written Argument - September 4, 2026 |
| MIPUG-36 | Gerdau Presentation - September 4, 2026 |
| MIPUG-37 | Chemtrade Logistics Presentation - September 4, 2026 |
| Exhibit No. | Description |
|---|---|
| MKO-01 | Intervener Application - February 24, 2026 |
| MKO-02 | Letter to Public Utilities Board re Experts - March 6, 2026 |
| MKO-03 | Letter to Public Utilities Board - March 10, 2026 |
| MKO-04 | Letter to Public Utilities Board re Procedural Order 39/26 - March 13, 2026 |
| MKO-05 | MKO-MH Round I Information Requests 1-14 (Responses received April 15, 2026) - March 19, 2026 |
| MKO-06 | MKO-MH Round II Information Requests 1-7 (Responses received May 22, 2026) - April 30, 2026 |
| MKO-07 | MKO-EM Round II Informatoon Request - (Responses received May 22, 2026) - April 30, 2026 |
| MKO-08 | Letter to PUB re Motion to Compel Responses to Round II IRs - May 27, 2026 |
| MKO-09 | Letter to PUB re Request for Extension of Time on Intervener Evidence - June 8, 2026 |
| MKO-10 | Letter to PUB re Intervener Evidence - June 12, 2026 |
| MKO-11 | Boost Energix Evidence - June 12, 2026 |
| MKO-12 | R. Datta Expert Opinion Letter - June 12, 2026 |
| MKO-13 | Letter to PUB re Scope of Oral Evidence - June 19, 2026 |
| MKO-14 | Letter to PUB re Information Request Responses on Evidence - July 10, 2026 |
| MKO-15 | Opening Statement - July 27, 2026 |
| MKO-16 | Boost Energex Supplemental Evidence - July 28, 2026 |
| MKO-17 | Boost Energex Presentation - August 13, 2026 |
| MKO-18 | Datta Presentation - August 13, 2026 |
| MKO-19 | Closing Submissions of MKO - September 3, 2026 |
| MKO-20 | Written Closing Submissions - September 3, 2026 |
| Exhibit No. | Description |
|---|---|
| SB-01 | Application for Intervener Status - May 25, 2026 |
| SB-02 | Letter to PUB re Reply to Responses for Intervener Status - May 28, 2026 |
| SB-03 | Letter to PUB re Budget and Information Requests - June 15, 2026 |
| SB-04 | SB-MH Information Requests 1-15 - June 15, 2026 |
| SB-05 | Review of Manitoba Hydro's Major New Facilities Proposal - June 25, 2026 |
| SB-06 | Letter to PUB re Round 4 Information Requests - Motion regarding Incomplete Responses - August 13, 2026 |
| SB-07 | Letter to PUB re Response to Manitoba Hydro's Response to Sustainable Brandon Motion - August 15, 2026 |
| SB-08 | CV of Bruce Duggan - August 28, 2026 |
| SB-09 | Presentation of Sustainable Brandon - August 28, 2026 |
| SB-10 | Addendum to Sustainable Brandon Presentation - August 28, 2026 |
| SB-11 | Sustainable Brandon Closing Submission - September 3, 2026 |
| SB-12 | Sustainable Brandon Written Closing Submission - September 5, 2026 |