Exhibit No. | Description |
---|---|
MH-1 | Manitoba Hydro Presentation Pre-Hearing Conference May 16, 2013 |
MH-2 | Manitoba Hydro Letter to PUB re Pre-Hearing Conference Matters |
MH-3 | Affidavit of Publication and Notice of Service for the Pre-Hearing Conference |
MH-4 | Manitoba Hydro Letter to PUB re Order 67/10 |
MH-5-1 | Manitoba Hydro Letter to PUB re Macro-Environmental and Socio-Economic Matters |
MH-5-2 | Appendix A - Screening Characteristics of Resource Technologies |
MH-5-3 | Appendix B - Blank Summary Data Sheet Template |
MH-5-4 | Appendix C - Selected Resource Option Comparison Table |
MH-5-5 | Appendix D - Summary of Multiple Account Framework |
MH-6 | Manitoba Hydro Letter to PUB re Load Forecast |
MH-7 | Manitoba Hydro Letter to PUB re Request for Extension by CAC/Definitions |
MH-8 | Manitoba Hydro Letter to PUB re MMF budget and definitions |
MH-9 | Manitoba Hydro Letter to PUB re CAC Definitions |
MH-10 | Manitoba Hydro Letter to PUB re MIPUG Proposed Budget |
MH-11 | Manitoba Hydro Letter to PUB re GAC Proposed Budget |
MH-12 | Manitoba Hydro Letter to PUB re CAC DSM Potential Study |
MH-13 | Manitoba Hydro Letter to PUB re MKO Proposed Budget |
MH-14 | Manitoba Hydro NFAT Business Case – Complete Filing (as last revised November 29, 2013) |
MH-15 | Manitoba Hydro Letter to Knight Piesold re info for NFAT |
MH-16 | Manitoba Hydro Letter to PUB re NFAT Submission Errata |
MH-17 | Manitoba Hydro Letter to PUB re MMF Submission to Pre-Hearing Conference of Sept. 4, 2013 |
MH-18 | Manitoba Hydro Letter to PUB re IRs |
MH-19 | Manitoba Hydro Letter to PUB re Motion Round 1 IRs |
MH-20 | Manitoba Hydro Letter to PUB re IEC Role |
MH-21 | Manitoba Hydro Concordance Analysis re NFAT IRs |
MH-22 | Manitoba Hydro Letter to PUB re Role of IEC |
MH-23 | Manitoba Hydro Letter to PUB re Preliminary Review of IRs |
MH-24 | Manitoba Hydro Letter to PUB re Load Forecast/Customer Confidential Information |
MH-25 | Manitoba Hydro Letter to PUB re NFAT Schedule |
MH-26 | Manitoba Hydro Letter to PUB re Load Forecast |
MH-27 | Manitoba Hydro Letter to PUB re Review of IEC Reports |
MH-28 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-29 | Manitoba Hydro Letter to PUB re Status of Round 1 IRs |
MH-30 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-31 | Manitoba Hydro Letter to PUB re Export Contracts |
MH-31-1 | Wisconsin Public Service Corporation and Manitoba Hydro Term Sheet |
MH-31-2 | Northern States Power Company and Manitoba Hydro Power Sale Agreement |
MH-31-3 | Wisconsin Public Service Corporation and Manitoba Hydro Agreement |
MH-31-4 | Wisconsin Public Service Corporation and Manitoba Hydro Sale Agreement |
MH-31-5 | Minnesota Power and Manitoba Hydro Power Sale Agreement |
MH-31-6 | Great River Energy and Manitoba Hydro Term Sheet |
MH-31-7 | Minnesota Power and Manitoba Hydro Term Sheet |
MH-31-8 | Great River Energy and Manitoba Hydro Diversity Agreement |
MH-31-9 | Saskatchewan Power Corporation and Manitoba Hydro Diversity Agreement |
MH-31-10 | Minnesota Power and Manitoba Hydro Term Sheet 250mw |
MH-32 | Manitoba Hydro Letter to PUB re Status of Round 1 IRs |
MH-33 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-34-1 | Manitoba Hydro Letter to PUB re NFAT Schedule/Timelines |
MH-34-2 | Attachment 1 to December 4, 2013 Letter |
MH-34-3 | Attachment 2 to December 4, 2013 Letter |
MH-35 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-36 | Manitoba Hydro Letter to PUB re NFAT Schedule/Timelines |
MH-37 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-38 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-39 | Manitoba Hydro Letter to PUB re Further Explanation PDP |
MH-40 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-41 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-42 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-43 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-44 | Manitoba Hydro Letter to PUB re NFAT Schedule/Timelines |
MH-45 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-46 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-47 | Manitoba Hydro Letter to PUB re Proposed MIPUG Public Sector Finance Witness |
MH-48 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-49 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-50 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-51 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-52 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-53 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-54 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-55 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-56 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-57 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-58 | Manitoba Hydro Letter to PUB re Proposal of CAC to Present Socio-Economic Evidence |
MH-59 | Manitoba Hydro Letter to PUB re Proposal of MKO to Present Dr. Dick |
MH-60 | Manitoba Hydro Letter to PUB re joint CAC/MMF Proposal |
MH-61 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-62 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-63 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-64 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-65 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-66 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-67 | Manitoba Hydro/La Capra Information Requests |
MH-68 | Manitoba Hydro/Elenchus Information Requests |
MH-69 | Manitoba Hydro/Knight Piesold Information Requests |
MH-70 | Manitoba Hydro/MNP Information Requests |
MH-71 | Manitoba Hydro/Morrison Park Advisors Information Requests |
MH-72 | Manitoba Hydro/Power Engineers Information Requests |
MH-73 | Manitoba Hydro/Potomac Economics Information Requests |
MH-74 | Manitoba Hydro/TyPlan Information Requests |
MH-75 | Manitoba Hydro/CAC Information Requests |
MH-76 | Manitoba Hydro/CAC Information Requests |
MH-77 | Manitoba Hydro/GAC Information Requests |
MH-78 | Manitoba Hydro/MIPUG Information Requests |
MH-79 | Manitoba Hydro/MMF Information Requests |
MH-80 | Manitoba Hydro Letter to PUB re Supplemental Responses to Round 1 Information Requests |
MH-81 | Manitoba Hydro Letter to PUB re Filing of Responses to Round 2 IRs |
MH-82 | Manitoba Hydro Letter to PUB re Right of Cross by IEC Counsel |
MH-83 | Manitoba Hydro Letter to PUB re Evidence of Whitfield Russell |
MH-84 | Manitoba Hydro Letter to PUB re Witness CV's (CV's attached) |
MH-85 | Manitoba Hydro Rebuttal Evidence |
MH-85-1 | Manitoba Hydro Rebuttal Evidence - Whitfield Russell Associates (WRA) Report |
MH-85-2 | Manitoba Hydro Rebuttal Evidence – Oral Evidence |
MH-86 | Manitoba Hydro - Ed Wojczynski Presentation |
MH-87 | Manitoba Hydro - Lloyd Kuczek Presentation |
MH-88 | Manitoba Hydro Brochure Pick the right heating system for your home |
MH-89 | Preliminary Indications of Potential Future Changes in Keeyask ISD |
MH-90 | Manitoba Hydro Responses to Undertaking #10 and #11 |
MH-91 | Manitoba Hydro Response to Undertaking #5 and #6 |
MH-92-1 | Manitoba Hydro CVs for Panel II |
MH-92-2 | Manitoba Hydro CV Kristina Koenig |
MH-92-3 | Manitoba Hydro CVs for Darren Rainkie, Manny Schulz and Liz Carriere |
MH-92-4 | Manitoba Hydro CV for Greg Barnlund |
MH-92-5 | MH Cover Letter CVs re Socio Economic Panel |
MH-92-5 | MH CVs Socio Economic Panel |
MH-92-5 | MH Witness CV Socio Economic Panel Karen Anderson |
MH-93 | Manitoba Hydro Response to Undertaking #13 |
MH-94 | Manitoba Hydro Response to Undertaking #16 |
MH-95 | Manitoba Hydro Need Alternatives and Economic Valuation |
MH-96 | Manitoba Hydro List of Recommended Reading Prior to start of NFAT |
MH-97 | Manitoba Hydro Integrated Financial Forecast (IFF13) 2013/14 - 2032/33 |
MH-98 | Manitoba Hydro Capital Expenditure Forecast (CEF13) 2013/14 - 2032/33 |
MH-99 | Manitoba Hydro Response to Undertaking #1 |
MH-100 | Manitoba Hydro Response to Undertaking #2 |
MH-101 | Manitoba Hydro Response to Undertaking #22 |
MH-102 | Manitoba Hydro Response to Undertaking #17 |
MH-103 | Manitoba Hydro Response to Undertaking #19 |
MH-104 | Manitoba Hydro DSM Analysis |
MH-104-1 | DSM Analysis - Listing New Resources by Development Plan and In-Service Date |
MH-104-1-1 | DSM Analysis Listing of New Resources by Development Plans and In-Service Dates Plans 2 & 6 |
MH-104-2 | Economic Uncertainty Analysis Results – updated Analysis with Revised Capital Costs & Common Factors |
MH-104-3 | Manitoba Hydro Supply and Demands Tables - DSM Evaluation |
MH-104-3-1 | Manitoba Hydro Supply and Demand Tables – Plan 2 DSM Level 2 |
MH-104-3-2 | Manitoba Hydro Supply and Demand Tables – DSM Analysis – Plan 4 K19/Gas40/250MW |
MH-104-3-3 | Manitoba Hydro Supply and Demand Tables – DSM Analysis – Plan 12 K19/C40/750MW DSM Level 2 |
MH-104-4 | Manitoba Hydro DSM Analysis Economic Summary Tables |
MH-104-4-1 | Manitoba Hydro DSM Analysis Economic Summary Tables using 4.65% Discount Rate |
MH-104-4-2 | REVISED MH DSM Analysis Economic Summary Tables Plan 2 Level 2 DSM |
MH-104-4-2 | DSM Analysis Economic Summary Tables Plan 2 Level 2 DSM |
MH-104-4-3 | DSM Analysis – Economic Summary Tables – Plan 4 Level 2 DSM at 5.40% and 4.65% Discount Rate |
MH-104-4-4 | DSM Analysis – Economic Summary Tables – Plan 12 Level 2 DSM at 5.40% and 4.65% Discount Rate |
MH-104-5 | Incremental NPVs provided in updated Quilt Page 2 of 7 (MH 104-2) |
MH-104-6 | DSM Analysis Economic Summary Tables Plan 6 - DSM Level 2 |
MH-104-7 | Supply and Demand Tables DSM Analysis Plan 6 - DMS Level 2 |
MH-104-8 | Und #27 Updated calculations on all plans with new information provided by MH Mar 10 2014 |
MH-104-9 | Economic Summary Tables similar to MH 104-5 for Plans 6, 12, 5 and 142 |
MH-104-10 | NPV Revenue Impacts - Reference MIPUG-21, Question 4 |
MH-104-11 | Und #55 High Capital Cost Stress Tests Keeyask and Conawapa Plan 5, 6 and 14 |
MH-104-12-1 | Manitoba Hydro DSM Financial Evaluation Overview |
MH-104-12-2 | Manitoba Hydro DSM Rate Methodology Summary |
MH-104-12-3 | Manitoba Hydro Pro-Forma financial tables (3 tables) |
MH-104-12-4 | NFAT Pro Forma Financial Statements |
MH-104-12-5 | Addendum to DSM Financial Evaluation Overview |
MH-104-12-6 | NFAT DSM Financials |
MH-104-12-7 | NFAT DSM Analysis Main Rate Methodology |
MH-104-13 | Economic Summary Tables - Flat Load Growth Beyond 2022-23 |
MH-104-14 | Incremental NPV relative to All Gas @ 5.05% Discount Rate |
MH-104-14-1 | Economic Summary Tables – Comparison of Plan 14 (with LCA Load Reduction) and Plan 17 (No Gen Case) |
MH-104-14-2 | Supply and Demand Tables – Plans 14 and 17 (LCA Hypothetical No New Generation plan) with LCA Load Load Reduction |
MH-104-15 | Update to MH-129-7, Page 2 NPV relative to All Gas at specified level of DSM |
MH-104-15 | Revision 1 - Update to MH-129-7, Page 2 NPV relative to All Gas at specified level of DSM - April 28, 2014 |
MH-104-15 | Revision 2 - Update to MH-129-7, Page 2 NPV relative to All Gas at specified level of DSM - April 29, 2014 |
MH-104-15 | Revision 3 - Update to MH-129-7, Page 2 NPV relative to All Gas at specified level of DSM – May 1, 2014 |
MH-104-16 | DSM Total Resource Cost View Economic Summary All Gas with Base DSM |
MH-104-16 | Revision 1 - DSM Total Resource Cost View Economic Summary All Gas with Base DSM - April 28, 2014 |
MH-104-16 | Revision 2 - DSM Total Resource Cost View Economic Summary All Gas with Base DSM – April 29, 2014 |
MH-104-16 | Revision 3 - DSM Total Resource Cost View Economic Summary All Gas with Base DSM – May 1, 2014 |
MH-105 | Manitoba Hydro Response to Undertaking #20 |
MH-106 | Manitoba Hydro Response to Undertaking #8 |
MH-107 | REVISED Manitoba Hydro Response to Undertaking #30 |
MH-108 | Manitoba Hydro Response to Undertaking #12 |
MH-109 | Manitoba Hydro Response to Undertaking #34 |
MH-110 | Und #31 Manitoba Hydro to provide provision of DSM plan evaluations |
MH-111 | Manitoba Hydro NFAT Financial Panel Presentation |
MH-112 | MH Response Und #24 and #28 Net Present Values |
MH-113 | MH Response Und #35 update PUB 58-3 Tab 27 to include CEF 13 |
MH-114 | MH Response Und #41 Levelized Cost of Keeyask & Conawapa using Current Capital Cost |
MH-114 | Attachment A - MH Response to Und #41 |
MH-115 | MH Response Und #37 Revised Table 2 Pg 67 MB Hydro Rebuttal Evidence |
MH-116 | MH Response Und #38 Wind Cost Clarification (LCA MH II 30 Attachment) |
MH-117 | MH Response Und #39 Explanation of Fixed O & M Costs On-Shore Wind Appendix 7.2 NFAT Submission |
MH-118 | Average Residential Price of Electricity Provinces/States in North America |
MH-119 | MH Response Und# 25 is DSM consistent with Board Order 43/13 Pg 44 |
MH-120 | MH Response Und#32 Importers to MISO Region and Volumes |
MH-121 | Projected Residential Annual Charges updating CAC 45-6 Tab 5 |
MH-121 | REVISED - Projected Residential Annual Charges updating CAC 45-6 Tab 5 |
MH-122 | MH Response Und #7 Consumption reduction impact Fuel Switching 100% success rate |
MH-123 | MH Response Und #15 Confirm Information on Page 94 of PUB Book of Documents |
MH-124 | MH Response Und #47 MH provide Electric Operations financial ratios for IFF13 |
MH-125 | Und #46 Exposure to Drought Costs |
MH-126 | Und #21 MH Focus Group Methodology for Power Smart messages |
MH-127 | Und #29 Dependable Energy with Great River Energy 200MW Diversity Agreement |
MH-128 | Manitoba Hydro Supply and Demands Tables - DSM Evaluation |
MH-129 | Manitoba Hydro Societal Panel Presentation |
MH-129-1 | MH Societal Panel Opening Remarks |
MH-129-2 | MH Preferred Development Plan Overall Project Approach |
MH-129-3 | Societal Panel Matrix Presentation |
MH-129-4 | MH Societal Panel Economic Impact Analysis |
MH-129-5 | MH Societal Panel Sustainable Development |
MH-129-6 | MH Multiple Account Benefit-Cost Analysis |
MH-129-7 | MH Integration of Perspectives & Overall NFAT Conclusion |
MH-130 | MH Cree Nation Partners Brochure |
MH-131 | MH Keeyask - Our Story - video presentation (English) |
MH-131 | MH Keeyask - Our Story - video presentation (Cree) |
MH-132 | MH Response Und #61 JKDA Person Years of Employment Clarification |
MH-133 | Written Statement of Mr. Victor Spence - Cree Nation Partners |
MH-134 | NCN Wuskwatim Employment - The Picture as Project Nears Completion |
MH-135 | Und #3 Dependable Energy Long-Term Fixed Contracts (Ref Tab 12 PUB Book of Docs) |
MH-136 | Und #40 Wind Integration Costs Clarification from Appendix 9-3 vs LCA/MH I 308 |
MH-137 | Und #62 Value of First Nation Contracts for Keeyask |
MH-138 | MH response to PUB re table plotting MH firm energy based on DSM Level 2 (with and without the new pipeline load) |
MH-139 | Und #26 MH vs Minn Power responsibility & Und #42 Slide 88 of MH-99 |
MH-140 | Und #36 - 3 most current CPJs for Keeyask Conawapa and Bipole III |
MH-141 | Und #63 HNTEI Statistics |
MH-142 | Und #64 People Participating in Tataskewyak and Weslake Training Program |
MH-143 | Und #65 Keeyask hires to date through HNTEI Training Initiative |
MH-144 | Und #66 Capital Tax Water Rental and debt guarantee fee |
MH-145 | Und #68 Description of offsetting Programs per Adverse Effects Agreement |
MH-146 | Und #72 Person Years vs Hires |
MH-147 | Und #44 MH-103 Clarification – Historical Accuracy and Probabilitic Analysis |
MH-148 | Und #69 Intensity - Board, GHG Emissions filed in NFAT |
MH-149 | Und #48 Selection of Preferred Plan and Switching to Pathway #5 in 2017 |
MH-150 | Und #54 Projected Net Debt and Increased Capital Costs in Keeyask and Conawapa |
MH-151 | Manitoba Hydro Book of Documents - Potomac - MISO Export Markets |
MH-152 | Manitoba Hydro Redaction Criteria |
MH-153 | Manitoba Hydro Power Smart Plan 2014-2017 |
MH-154 | Und #74 - Summary of Wuskwatim PDA Regarding Transmission and Financial Arrangements |
MH-154 | REVISED - Und #74 - Summary of Wuskwatim PDA Regarding Transmission and Financial Arrangements |
MH-155 | Und #77 Burntwood Nelson Agreement Elements of Renegotiation |
MH-156 | Request of Manitoba Hydro regarding Mr. Thomson NPV of Flat Load 750MW line Keeyask and Existing Contracts into future |
MH-157 | Und #43 Explanation of Revised Capital Costs for Keeyask and Conawapa |
MH-158 | MB Hydro Book of Documents - Elenchus (ERA) - Load Forecasting & DSM |
MH-159 | Und #70 - Socio Economic Benefits to Non-Aboriginal and Aboriginal Communities |
MH-160 | Und #73 – Activities on Keeyask, Conawapa and 500 KV line underway |
MH-161 | MB Hydro response to MIPUG Exhibit 21 - Base Costs and In-Service Costs |
MH-162 | Manitoba Lake Sturgeon Management Strategy 2012 |
MH-163 | TCN’s Experience in relation to employment/training and challenges |
MH-164 | Bill impact to homeowner by adopting DSM |
MH-165 | MB Hydro letter to BBE Hydro Construction - Notice to proceed with Phase II Site Work |
MH-166 | Und #79 - Capital Cost Sensitivity (Slide 11 of MH-129-6) |
MH-167 | Manitoba Hydro Book of Documents - LCA |
MH-167-1 | Manitoba Hydro Book of Documents - LCA - Vol 1 |
MH-167-2 | Manitoba Hydro Book of Documents - LCA - Vol 2 |
MH-167-3 | Manitoba Hydro Book of Documents - LCA - Vol 3 |
MH-168 | Und #52 Costs Included in US Portion of Great Northern Transmission Line |
MH-169 | Und #18 Projected DSM Savings Per Program |
MH-170 | Und #55 Economic and Financial Analysis of high capital cost scenario |
MH-171 | Economics of DSM Scenario Assumptions |
MH-171 | Revision 1 - Economics of DSM Scenario Assumptions - April 15, 2014 |
MH-171 | Revision 2 - Economics of DSM Scenario Assumptions - April 26, 2014 |
MH-171 | Revision 3 - Economics of DSM Scenario Assumptions - April 29, 2014 |
MH-171 | Revision 4 - Economics of DSM Scenario Assumptions - May 1, 2014 |
MH-172 | Und #53 - DSM 20 year costs |
MH-173 | MH Book of Documents - Knight Piésold |
MH-174 | MH Response to MIPUG Exhibit 21, Question 3 - Updated NPV Chart |
MH-175 | Und #67 - Return on Equity |
MH-176-1 | MH Response PUB Question #1 Peak and Off-Peak Generation & Transmission Losses |
MH-176-2 | MH Response PUB Question #2 - HVDC Losses |
MH-176-3 | MH Response PUB Question #3 - Domestic Loads and Load Losses |
MH-177 | Manitoba Hydro Responses to CAC Exhibit #51 |
MH-177-1-1 | Keeyask Costs |
MH-177-1-2 | Conawapa Costs |
MH-177-1-3 | Keeyask In-Service Costs |
MH-177-1-4 | Conawapa In-Service Costs |
MH-177-2-1 | Low and High Update values Keeyask |
MH-177-2-2 | Low and High Update Conawapa |
MH-177-3-1 | Revised Quilt |
MH-177-3-2 | MH 104-8 S-Curves Plans 2 and 14 |
MH-177-3-3 | MH 104-8 S-Curves Plan 5 and 6 |
MH-177-3-3a | Attached S-Curve spreadsheet |
MH-177-3-4 | MH 104-8 S-Curves Plans 12 and 14 |
MH-177-3-4a | Attached S-Curve spreadsheet |
MH-177-3-4b | Attached S-Curve spreadsheet |
MH-177-4-1 | MH 104-5 and MH 104-9 Economic Summary Table |
MH-177-5-1 | MH 95 Slide 130 and MH 129-7 Slide 2 DSM |
MH-177-5-2 | MH 95 Slide 130 and MH 129-7 Slide 2 Economic Summary Table |
MH-177-5-2b | Economic Summary - DSM Analysis - Total Resource Cost |
MH-178 | Und #80 MH to advise why amounts redacted in MH-137 are CSI |
MH-179 | Manitoba Hydro Book of Documents – MPA |
MH-180 | Power Smart Plan 2014-2017 Supplemental Report |
MH-181 | Manitoba Hydro Employee Electric Heat Costs - Gillam, Manitoba |
MH-182 | Manitoba Hydro Book of Documents - Cross Examination CAC |
MH-183 | Manitoba Hydro Book of Documents - Socio Economic Issues |
MH-184 | First Nations Candidacy and On-Reserve Voting in Manitoba - Berdahl/Adams/Poelzer |
MH-185 | MH Response to GAC Pre-Ask Ref: NFAT Business Case, Ch 13, p. 45, lines 13-20 |
MH-186 | Manitoba Hydro Book of Documents – Gunn |
MH-187 | Sustainability Assessment – Pluralism, Practice and Progress |
MH-188 | Manitoba Hydro Book of Documents – Gunn |
MH-189 | MH Book of Documents – GAC Cross |
MH-190 | Manitoba Hydro Response to GAC Pre-Asks Question 4 b (MH-171 Revised) |
MH-190 | REVISED - Manitoba Hydro Response to GAC Pre-Asks Question 4 b (MH-171 Revised) |
MH-191 | Overview of Climate Change Impacts & what it means to Manitoba |
MH-191-1 | Manitoba Hydro Response to GAC Pre-Asks Question 2b |
MH-191-1 | Attachment 1. Excerpt from Climate Change Impacts in the United States – Overview & Report Findings |
MH-191-1 | Attachment 2. Excerpt from Climate Change Impacts in the United States – Chapter 18 - Midwest |
MH-192 | Update to Figure 14.2 Pathway Decision Tree ISD based on 2013 Load Forecast DSM Level 2 with Pipeline |
MH-193 | 2014-17 Power Smart Plan - Savings As % of Forecast Load |
MH-194 | Und #139 Keeyask In Service Date with Diversity Agreement |
MH-194 | REVISED Und #139 Keeyask In Service Date with Diversity Agreement |
MH-195 | Und #140 Diversity Agreements Feasibility |
MH-196 | MH Response to GAC Pre Asks Update Appendix 12-2 Hydro GRA 2010-12 |
MH-197 | MH Book of Documents - MMF Cross Examination |
MH-198 | Extracts of CEC Report on Keeyask Generation Project |
MH-199 | MH Response to GAC Pre-Asks – Question #5 |
MH-200 | MH Book of Documents - MMF - Whitfield Russell Associates |
MH-201 | MH Response to Undertaking #142 MP Contract Termination Conditions Precedent |
MH-202 | MH Response to Undertaking #137 – Incremental Savings Plan from Level 2 Scenario Analysis & 2014-2017 Power Smart Plan |
MH-203 | MH Response to Undertaking #138 – 2012/13 Power Smart Annual Review |
MH-204 | Manitoba Hydro Final Argument |
MH-205 | Manitoba Hydro – Outline of Manitoba Hydro Closing Comments |
MH-206 | Manitoba Hydro – Book of Documents – 10 Key Exhibits |
MH-207 | NFAT Final Argument of the Keeyask Partner First Nations |
MH-208 | May 26: NFAT Manitoba Hydro Short Story |
MH-209 | Final Oral Argument of the Cree |
MH-210 | MH Letter to PUB - Response to Undertaking #49 |
MH-211 | MH Response to Undertaking #49 |
MH-212 | |
MH-213 | MH Reponse to PUB May 28, 2014 Questions – Letter dated June 12, 2014 |
MH-213-1 | Financial Evaluation Overview – Hypothetical Plan 5 Deferred |
MH-213-2 | Financial Statements & Average Unit Tables – Hypothetical Plan 5 Deferred |
MH-213-3 | Cost Components for K26 (Hypothetical Plan 5 Deferred) |
MH-214 | MH Response to PUB May 31, 2014 Questions – Letter dated June 17, 2014 |
MH-214-1 | MH Response to PUB Additional Questions – May 31, 2014 |
MH-214-2 | Letter from Richard Doying (MISO) to David Cormie (MH) dated June 16, 2014 |